/
/
/
/
Roofing for underground tram stop – static of connections

Roofing for underground tram stop – static of connections

2021
Egoe plus a.s.
CZ-Brno
Statics, Production documentation

We created a 3D model and production documentation for this structure. We also prepared a design and assessment of all steel structure connections. As this was a structure in a public space, there was a requirement for architectural “cleanliness” of the steel structure details.

All joints were therefore designed to be concealed or minimalist, and the roof drainage was also designed to be concealed by the cavities in the columns. The structure was hot-dip galvanised and painted. The length, width and height of the structure are 77.0 x 25.6 x 8.7 m.

benefits

For more than 20 years we are innovating the industry by complex solutions with human approach.

daniel nedbal

Managing Director

Since 2001, we have been bringing quality that you can rely on.

We implement complex projects from design to turnkey production.

We are innovation experts that move your business forward.