A seven-span reinforced concrete box girder bridge with a total length of 885.6 m and an estimated steel box girder weight of 5,500 tonnes. Bridge spans 1 (90 m), 2 (135 m), 3 (135 m) and 7 (100 m) became a challenge for the second half of 2024. Our production documentation was sent to bridge workshops in Prague and Prostějov, which required coordination of the practices and production capabilities of individual workshops and consideration of their requirements in our documentation.