The single-span steel road bridge with a diagonal arch and welded tie rods with a span of 99.2 m, raised in two planes, offers a large number of details that needed to be resolved not only technically, but also had to be closely coordinated with the planned production process, mainly due to the accessibility of welders from inside the bridge cavity.