A seven-pile steel-concrete chamber bridge with a total length of 885.6 m and an estimated weight of the steel chamber of 5,500 tonnes. Bridge spans 1 (90 m), 2 (135 m), 3 (135 m) and 7 (100 m) became the challenge for the second half of 2024. Our production documentation went to the bridge works in Prague and Prostějov, which required coordination of the practices and production capabilities of the individual workshops and consideration of their requirements in our documentation.